Skip to content Skip to left sidebar Skip to footer

Town News

WATER BOIL ORDER LIFTED

INFORMATION FOR THE PUBLIC

The Boil Water issued on November 29th , 2018 for 99 to 169 Major’s Street, 96 to 210 Major’s Street, Circular Road, Collegiate Drive, Weir’s Avenue, Reid’s Lane, Dawe’s Lane, Decker’s Lane, Grenfell Place, Norman’s Lane, Harbour Drive and Tiggie’s Lane has been lifted as of
December 7th, 2018.

Arena

Due to a lack of volunteers including coaches, there will be no skating programs and hockey programs this year.

Road Closure, Water Shut off and Boil order

Road Closure and Water Shut Off

Please be advised the road is closed passed Foodland to the United Church until repairs are complete.

The water will be shut off again on Monday, December 3 from at 9:30 am to approximately 4:30 pm.

The water shut off will affect:

– 99 to 169 Major’s Street

– 96 to 210 Major’s Street

– Circular Road

– Collegiate Drive

-Weir’s Avenue

– Reid’s Lane

– Dawe’s Lane

– Decker’s Lane

– Grenfell Place

– Norman’s Lane

– Harbour Drive

– Tiggie’s Lane

This is to repair a break in the main water line.

A BOIL ORDER IS EFFECT FOR THE ABOVE AREAS.

We apologize for an inconvenience this may cause.

Notice of water shut off

Water Shut Off

There will a water shut off Thursday, November 29 from 1:00 pm to 4:30 pm and Friday, Nov 30 at 9:30 am to approximately 4:30 pm.
The water shut off will affect:
– 99 to 169 Major’s Street
– 96 to 210 Major’s Street
– Circular Road
– Collegiate Drive
-Weir’s Avenue
– Reid’s Lane
– Dawe’s Lane
– Decker’s Lane
– Grenfell Place
– Norman’s Lane
– Harbour Drive
– Tiggie’s Lane
This is to repair a break in the main water line. A BOIL ORDER will be in effect for the above places when the water is restored after the first shut off. We apologize for an inconvenience this may cause.

Winter Message

Winter Message

– Residents are reminded to move roadside garbage boxes and other structures back from side of streets (minimum 20 feet on side streets and 33 feet on main streets. This is approximate measurements). The Town and the Snow Clearing Contractor assumes no responsibility for damaged garbage boxes and structures due to snow clearing.

– Please reduce your speed in winter conditions.

– Take steps to secure your home, such as, cleaning your chimney, checking fire alarms, and planning for power outages and major snow falls.

– When winter parking, please move your vehicle off the shoulder of Town streets. Vehicles may be ticketed by the RCMP for parking on the street reservations.

– When removing snow from driveways, please do not deposit on Towns streets; this is against Town regulations and highway regulations. Charges may be laid by the RCMP.

Invitation for Quotes Pre-Season Snow Clearing

Invitation for Quotes
The Town of Roddickton-Bide Arm is now accepting quotes for
Snow Clearing Services (on a call-in basis)
from the period of November 15 – December 14, 2018.
Quotes, stating the rate per hour excluding the HST, will be accepted up to
4:30 pm on Wednesday, November 7, 2018.
Sealed quotes must be clearly marked “Pre-Season Snow Clearing” and submitted in person to the Town Office at 81 Major’s Street.
For further information, please contact the office at 457-2413.
The lowest of any quote not necessarily accepted or awarded.

The Town of Roddickton-Bide Arm is now accepting quotes for
Snow Clearing Services (on a call-in basis)
from the period of November 15 – December 14, 2018.
Quotes, stating the rate per hour excluding the HST, will be accepted up to
4:30 pm on Wednesday, November 7, 2018.
Sealed quotes must be clearly marked “Pre-Season Snow Clearing” and submitted in person to the Town Office at 81 Major’s Street.
For further information, please contact the office at 457-2413.
The lowest of any quote not necessarily accepted or awarded.